C00005 00002	GRANT STATUS for NSF-78 at the end of 04/80
C00007 00003	PROJECTION for NSF-78 for the month 05/80
C00011 00004	PROJECTION for NSF-78 for the month 06/80
C00015 00005	PROJECTION for NSF-78 for the month 07/80
C00019 00006	PROJECTION for NSF-78 for the month 08/80
C00023 00007	PROJECTION for NSF-78 for the month 09/80
C00026 00008	PROJECTION for NSF-78 for the month 10/80
C00030 00009	PROJECTION for NSF-78 for the month 11/80
C00034 00010	PROJECTION for NSF-78 for the month 12/80
C00038 00011	PROJECTION for NSF-78 for the month 01/81
C00042 00012	PROJECTION for NSF-78 for the month 02/81
C00046 00013	Summary of BINFORD on NSF-78 from 05/80 thru 02/81
C00048 00014	Summary of EARNEST on NSF-78 from 05/80 thru 02/81
C00049 00015	Summary of SOROKA on NSF-78 from 05/80 thru 02/81
C00051 00016	Summary of HAYES on NSF-78 from 05/80 thru 02/81
C00053 00017	Summary of POOR on NSF-78 from 05/80 thru 02/81
C00055 00018	Summary of FROST on NSF-78 from 05/80 thru 02/81
C00057 00019	Summary of GINI-G on NSF-78 from 05/80 thru 02/81
C00058 00020	Summary of GINI-M on NSF-78 from 05/80 thru 02/81
C00059 00021	Summary of COX on NSF-78 from 05/80 thru 02/81
C00061 00022	Summary of GOLDMAN on NSF-78 from 05/80 thru 02/81
C00063 00023	Summary of LOWE on NSF-78 from 05/80 thru 02/81
C00064 00024	Summary of MAPLES on NSF-78 from 05/80 thru 02/81
C00065 00025	Summary of MUJTABA on NSF-78 from 05/80 thru 02/81
C00067 00026	Summary of SALISBURY on NSF-78 from 05/80 thru 02/81
C00069 00027	Summary of BAKER on NSF-78 from 05/80 thru 02/81
C00070 00028	Summary of BLICHER on NSF-78 from 05/80 thru 02/81
C00071 00029	Summary of RUBLEE on NSF-78 from 05/80 thru 02/81
C00073 00030	Summary of SECRETARY on NSF-78 from 05/80 thru 02/81
C00075 00031	Summary of ALLEN on NSF-78 from 05/80 thru 02/81
C00076 00032	Summary of REFUND on NSF-78 from 05/80 thru 02/81
C00077 ENDMK
CāŠ—;
GRANT STATUS for NSF-78 at the end of 04/80
                                     To Date   Budgeted  Remaining
                                     -------   --------  ---------
SALARIES AND WAGES                 191413.36  270137.00   78723.64

STAFF BENEFITS                      37074.59   56594.00   19519.41

CAPITAL EXPENDITURES                    0.00   17405.00   17405.00

TRAVEL                               6221.18   13000.00    6778.82

EXPENDABLE MATERIALS                29289.06   29000.00     289.06-

INDIRECT COSTS                     153118.96  213864.00   60745.03

TOTAL                              417117.15  600000.00  182882.85
PROJECTION for NSF-78 for the month 05/80

Prepared by MAS using BUDGET on 07/11/80 at 15:46:38

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    52 % of    2736.00       1422.72 
 EARNEST    10 % of    3527.00        352.69 
 SOROKA     100% of    1870.00       1870.00 
 HAYES      30 % of    2125.00        637.50 
 POOR       25 % of    1802.00        450.50 
 FROST      30 % of    1948.00        584.40 
 GINI-G     100% of     500.00        500.00 
 GINI-M     100% of     500.00        500.00 
 COX        50 % of     994.00        497.00 
 GOLDMAN    50 % of    1074.00        537.00 
 LOWE       35 % of    1074.00        375.90 
 MAPLES     25 % of     994.00        248.50 
 MUJTABA    50 % of    1074.00        537.00 
 SALISBURY  50 % of    1074.00        537.00 
 BAKER      50 % of    1285.34        642.67 
 BLICHER    50 % of     936.00        468.00 
 RUBLEE     50 % of     953.32        476.66 
 SECRETARY  60 % of    1090.00        654.00 
 ALLEN      15 % of    1692.00        253.80 
                                  ----------
TOTAL SALARIES AND WAGES            11545.35  202958.70  270137.00   67178.29


STAFF BENEFITS at 0.192              2216.70   39291.29   56594.00   17302.70


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00       0.00   17405.00   17405.00


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00    6221.18   13000.00    6778.82


EXPENDABLE MATERIALS
   SAIL-COST-CENTER                  1548.00
   AVERAGE-EXPENDABLE-MATERIALS      1450.00
   RETRO-SAIL-COST-CENTER            1548.00
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS       4546.00   33835.06   29000.00    4835.06-


INDIRECT COSTS at 0.58              10618.67  163737.63  213864.00   50126.36

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                         28926.73  446043.88  600000.00  153956.11
PROJECTION for NSF-78 for the month 06/80

Prepared by MAS using BUDGET on 07/11/80 at 15:46:40

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    52 % of    2736.00       1422.72 
 EARNEST    5  % of    3527.00        176.34 
 SOROKA     100% of    1870.00       1870.00 
 HAYES      5  % of    2125.00        106.25 
 POOR       5  % of    1802.00         90.09 
 FROST      5  % of    1948.00         97.40 
 GINI-G     100% of     500.00        500.00 
 GINI-M     100% of     500.00        500.00 
 COX        50 % of     994.00        497.00 
 GOLDMAN    50 % of    1074.00        537.00 
 LOWE       35 % of    1074.00        375.90 
 MAPLES     25 % of     994.00        248.50 
 MUJTABA    50 % of    1074.00        537.00 
 SALISBURY  50 % of    1074.00        537.00 
 BAKER      50 % of    1285.34        642.67 
 BLICHER    50 % of     936.00        468.00 
 RUBLEE     50 % of     953.32        476.66 
 SECRETARY  60 % of    1090.00        654.00 
 ALLEN      10 % of    1692.00        169.19 
 REFUND     100% of    8818.00-      8818.00-
                                  ----------
TOTAL SALARIES AND WAGES             1087.75  204046.45  270137.00   66090.54


STAFF BENEFITS at 0.192               208.84   39500.14   56594.00   17093.85


CAPITAL EXPENDITURES
   COMPUTER                         27690.00
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES      27690.00   27690.00   17405.00   10285.00-


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00    6221.18   13000.00    6778.82


EXPENDABLE MATERIALS
   SAIL-COST-CENTER                  1548.00
   AVERAGE-EXPENDABLE-MATERIALS      1450.00
   BIS-MOVING-EXPENSES                596.00
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS       3594.00   37429.06   29000.00    8429.06-


INDIRECT COSTS at 0.58               2836.54  166574.18  213864.00   47289.81

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                         35417.14  481461.02  600000.00  118538.97
PROJECTION for NSF-78 for the month 07/80

Prepared by MAS using BUDGET on 07/11/80 at 15:46:43

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    52 % of    2736.00       1422.72 
 EARNEST    5  % of    3527.00        176.34 
 SOROKA     100% of    1870.00       1870.00 
 HAYES      5  % of    2125.00        106.25 
 POOR       5  % of    1802.00         90.09 
 FROST      5  % of    1948.00         97.40 
 GINI-G     100% of     500.00        500.00 
 GINI-M     100% of     500.00        500.00 
 COX        100% of     994.00        994.00 
 GOLDMAN    100% of    1074.00       1074.00 
 MUJTABA    100% of    1074.00       1074.00 
 SALISBURY  100% of    1074.00       1074.00 
 RUBLEE     0  % of     953.32          0.00 
 SECRETARY  60 % of    1090.00        654.00 
 ALLEN      10 % of    1692.00        169.19 
                                  ----------
TOTAL SALARIES AND WAGES             9802.02  213848.47  270137.00   56288.52


STAFF BENEFITS at 0.192              1881.98   41382.13   56594.00   15211.86


CAPITAL EXPENDITURES
   ADAC                              1380.00
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES       1380.00   29070.00   17405.00   11665.00-


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00    6221.18   13000.00    6778.82


EXPENDABLE MATERIALS
   SAIL-COST-CENTER                  1548.00
   AVERAGE-EXPENDABLE-MATERIALS      1450.00
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS       2998.00   40427.06   29000.00   11427.06-


INDIRECT COSTS at 0.58               8515.56  175089.74  213864.00   38774.25

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                         24577.57  506038.59  600000.00   93961.40
PROJECTION for NSF-78 for the month 08/80

Prepared by MAS using BUDGET on 07/11/80 at 15:46:49

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    52 % of    2736.00       1422.72 
 EARNEST    5  % of    3527.00        176.34 
 SOROKA     100% of    1870.00       1870.00 
 HAYES      5  % of    2125.00        106.25 
 POOR       5  % of    1802.00         90.09 
 FROST      5  % of    1948.00         97.40 
 GINI-G     100% of     500.00        500.00 
 GINI-M     100% of     500.00        500.00 
 COX        100% of     994.00        994.00 
 GOLDMAN    100% of    1074.00       1074.00 
 MUJTABA    100% of    1074.00       1074.00 
 SALISBURY  100% of    1074.00       1074.00 
 RUBLEE     0  % of     953.32          0.00 
 SECRETARY  60 % of    1090.00        654.00 
 ALLEN      10 % of    1692.00        169.19 
                                  ----------
TOTAL SALARIES AND WAGES             9802.02  223650.49  270137.00   46486.50


STAFF BENEFITS at 0.192              1881.98   43264.12   56594.00   13329.87


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00   29070.00   17405.00   11665.00-


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00    6221.18   13000.00    6778.82


EXPENDABLE MATERIALS
   SAIL-COST-CENTER                  1548.00
   AVERAGE-EXPENDABLE-MATERIALS      1450.00
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS       2998.00   43425.06   29000.00   14425.06-


INDIRECT COSTS at 0.58               8515.56  183605.31  213864.00   30258.68

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                         23197.57  529236.17  600000.00   70763.82
PROJECTION for NSF-78 for the month 09/80

Prepared by MAS using BUDGET on 07/11/80 at 15:46:53

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    52 % of    3009.59       1564.99 
 SOROKA     100% of    2057.00       2057.00 
 HAYES      5  % of    2337.50        116.87 
 POOR       5  % of    1982.19         99.10 
 FROST      5  % of    2142.80        107.13 
 GINI-G     50 % of     500.00        250.00 
 GINI-M     50 % of     500.00        250.00 
 COX        100% of     994.00        994.00 
 GOLDMAN    100% of    1074.00       1074.00 
 MUJTABA    100% of    1074.00       1074.00 
 SALISBURY  100% of    1074.00       1074.00 
 RUBLEE     0  % of    1048.65          0.00 
 SECRETARY  60 % of    1199.00        719.40 
                                  ----------
TOTAL SALARIES AND WAGES             9380.51  233031.01  270137.00   37105.98


STAFF BENEFITS at 0.21               1969.90   45234.02   56594.00   11359.97


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00   29070.00   17405.00   11665.00-


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00    6221.18   13000.00    6778.82


EXPENDABLE MATERIALS
   SAIL-COST-CENTER                  1548.00
   AVERAGE-EXPENDABLE-MATERIALS      1450.00
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS       2998.00   46423.06   29000.00   17423.06-


INDIRECT COSTS at 0.58               8322.08  191927.39  213864.00   21936.60

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                         22670.51  551906.69  600000.00   48093.31
PROJECTION for NSF-78 for the month 10/80

Prepared by MAS using BUDGET on 07/11/80 at 15:47:02

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    52 % of    3009.59       1564.99 
 SOROKA     100% of    2057.00       2057.00 
 HAYES      5  % of    2337.50        116.87 
 POOR       5  % of    1982.19         99.10 
 FROST      5  % of    2142.80        107.13 
 COX        50 % of    1114.00        557.00 
 GOLDMAN    50 % of    1202.00        601.00 
 LOWE       35 % of    1202.00        420.70 
 MAPLES     25 % of    1114.00        278.50 
 MUJTABA    50 % of    1202.00        601.00 
 SALISBURY  50 % of    1202.00        601.00 
 BAKER      50 % of    1439.58        719.79 
 BLICHER    50 % of    1439.58        719.79 
 RUBLEE     50 % of    1048.65        524.32 
 SECRETARY  60 % of    1199.00        719.40 
                                  ----------
TOTAL SALARIES AND WAGES             9687.62  242718.63  270137.00   27418.36


STAFF BENEFITS at 0.21               2034.40   47268.43   56594.00    9325.56


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00   29070.00   17405.00   11665.00-


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00    6221.18   13000.00    6778.82


EXPENDABLE MATERIALS
   SAIL-COST-CENTER                  1548.00
   AVERAGE-EXPENDABLE-MATERIALS      1450.00
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS       2998.00   49421.06   29000.00   20421.06-


INDIRECT COSTS at 0.58               8537.61  200465.01  213864.00   13398.98

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                         23257.63  575164.32  600000.00   24835.67
PROJECTION for NSF-78 for the month 11/80

Prepared by MAS using BUDGET on 07/11/80 at 15:47:07

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    52 % of    3009.59       1564.99 
 SOROKA     100% of    2057.00       2057.00 
 HAYES      5  % of    2337.50        116.87 
 POOR       5  % of    1982.19         99.10 
 FROST      5  % of    2142.80        107.13 
 COX        50 % of    1114.00        557.00 
 GOLDMAN    50 % of    1202.00        601.00 
 LOWE       35 % of    1202.00        420.70 
 MAPLES     25 % of    1114.00        278.50 
 MUJTABA    50 % of    1202.00        601.00 
 SALISBURY  50 % of    1202.00        601.00 
 BAKER      50 % of    1439.58        719.79 
 BLICHER    50 % of    1439.58        719.79 
 RUBLEE     50 % of    1048.65        524.32 
 SECRETARY  60 % of    1223.00        733.80 
                                  ----------
TOTAL SALARIES AND WAGES             9702.02  252420.66  270137.00   17716.33


STAFF BENEFITS at 0.21               2037.42   49305.85   56594.00    7288.14


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00   29070.00   17405.00   11665.00-


TRAVEL
   CADcAM                             800.00
                                  ----------
TOTAL FOR TRAVEL                      800.00    7021.18   13000.00    5978.82


EXPENDABLE MATERIALS
   SAIL-COST-CENTER                  1548.00
   AVERAGE-EXPENDABLE-MATERIALS      1450.00
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS       2998.00   52419.06   29000.00   23419.06-


INDIRECT COSTS at 0.58               9011.71  209476.73  213864.00    4387.26

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                         24549.16  599713.48  600000.00     286.51
PROJECTION for NSF-78 for the month 12/80

Prepared by MAS using BUDGET on 07/11/80 at 15:47:09

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    52 % of    3009.59       1564.99 
 SOROKA     100% of    2057.00       2057.00 
 HAYES      5  % of    2337.50        116.87 
 POOR       5  % of    1982.19         99.10 
 FROST      5  % of    2142.80        107.13 
 COX        50 % of    1114.00        557.00 
 GOLDMAN    50 % of    1202.00        601.00 
 LOWE       35 % of    1202.00        420.70 
 MAPLES     25 % of    1114.00        278.50 
 MUJTABA    50 % of    1202.00        601.00 
 SALISBURY  50 % of    1202.00        601.00 
 BAKER      50 % of    1439.58        719.79 
 BLICHER    50 % of    1439.58        719.79 
 RUBLEE     50 % of    1048.65        524.32 
 SECRETARY  60 % of    1223.00        733.80 
                                  ----------
TOTAL SALARIES AND WAGES             9702.02  262122.68  270137.00    8014.31


STAFF BENEFITS at 0.21               2037.42   51343.28   56594.00    5250.72


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00   29070.00   17405.00   11665.00-


TRAVEL
   IJCPR                              850.00
                                  ----------
TOTAL FOR TRAVEL                      850.00    7871.18   13000.00    5128.82


EXPENDABLE MATERIALS
   SAIL-COST-CENTER                  1548.00
   AVERAGE-EXPENDABLE-MATERIALS      1450.00
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS       2998.00   55417.06   29000.00   26417.06-


INDIRECT COSTS at 0.58               9040.71  218517.45  213864.00    4653.45-

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                         24628.16  624341.66  600000.00   24341.65-
PROJECTION for NSF-78 for the month 01/81

Prepared by MAS using BUDGET on 07/11/80 at 15:47:21

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    52 % of    3009.59       1564.99 
 SOROKA     100% of    2057.00       2057.00 
 HAYES      5  % of    2337.50        116.87 
 POOR       5  % of    1982.19         99.10 
 FROST      5  % of    2142.80        107.13 
 COX        50 % of    1114.00        557.00 
 GOLDMAN    50 % of    1202.00        601.00 
 LOWE       35 % of    1202.00        420.70 
 MAPLES     25 % of    1114.00        278.50 
 MUJTABA    50 % of    1202.00        601.00 
 SALISBURY  50 % of    1202.00        601.00 
 BAKER      50 % of    1439.58        719.79 
 BLICHER    50 % of    1439.58        719.79 
 RUBLEE     50 % of    1048.65        524.32 
 SECRETARY  60 % of    1223.00        733.80 
                                  ----------
TOTAL SALARIES AND WAGES             9702.02  271824.70  270137.00    1687.70-


STAFF BENEFITS at 0.21               2037.42   53380.70   56594.00    3213.29


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00   29070.00   17405.00   11665.00-


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00    7871.18   13000.00    5128.82


EXPENDABLE MATERIALS
   SAIL-COST-CENTER                  1702.80
   AVERAGE-EXPENDABLE-MATERIALS      1450.00
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS       3152.80   58569.86   29000.00   29569.85-


INDIRECT COSTS at 0.58               8637.50  227154.95  213864.00   13290.95-

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                         23529.75  647871.41  600000.00   47871.40-
PROJECTION for NSF-78 for the month 02/81

Prepared by MAS using BUDGET on 07/11/80 at 15:47:23

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    52 % of    3009.59       1564.99 
 SOROKA     100% of    2057.00       2057.00 
 HAYES      5  % of    2337.50        116.87 
 POOR       5  % of    1982.19         99.10 
 FROST      5  % of    2142.80        107.13 
 COX        50 % of    1114.00        557.00 
 GOLDMAN    50 % of    1202.00        601.00 
 LOWE       35 % of    1202.00        420.70 
 MAPLES     25 % of    1114.00        278.50 
 MUJTABA    50 % of    1202.00        601.00 
 SALISBURY  50 % of    1202.00        601.00 
 BAKER      50 % of    1439.58        719.79 
 BLICHER    50 % of    1439.58        719.79 
 RUBLEE     50 % of    1048.65        524.32 
 SECRETARY  60 % of    1223.00        733.80 
                                  ----------
TOTAL SALARIES AND WAGES             9702.02  281526.73  270137.00   11389.73-


STAFF BENEFITS at 0.21               2037.42   55418.12   56594.00    1175.87


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00   29070.00   17405.00   11665.00-


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00    7871.18   13000.00    5128.82


EXPENDABLE MATERIALS
   SAIL-COST-CENTER                  1702.80
   AVERAGE-EXPENDABLE-MATERIALS      1450.00
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS       3152.80   61722.65   29000.00   32722.65-


INDIRECT COSTS at 0.58               8637.50  235792.46  213864.00   21928.46-

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                         23529.75  671401.16  600000.00   71401.16-
Summary of BINFORD on NSF-78 from 05/80 thru 02/81

month               salary     this month      to-date
-----               ------     ----------      -------

05/80   52 % of    2736.00       1422.72       1422.72 
06/80   52 % of    2736.00       1422.72       2845.44 
07/80   52 % of    2736.00       1422.72       4268.16 
08/80   52 % of    2736.00       1422.72       5690.88 
09/80   52 % of    3009.59       1564.99       7255.87 
10/80   52 % of    3009.59       1564.99       8820.86 
11/80   52 % of    3009.59       1564.99      10385.85 
12/80   52 % of    3009.59       1564.99      11950.84 
01/81   52 % of    3009.59       1564.99      13515.84 
02/81   52 % of    3009.59       1564.99      15080.83 
Summary of EARNEST on NSF-78 from 05/80 thru 02/81

month               salary     this month      to-date
-----               ------     ----------      -------

05/80   10 % of    3527.00        352.69        352.69 
06/80   5  % of    3527.00        176.34        529.04 
07/80   5  % of    3527.00        176.34        705.39 
08/80   5  % of    3527.00        176.34        881.74 
09/80
10/80
11/80
12/80
01/81
02/81
Summary of SOROKA on NSF-78 from 05/80 thru 02/81

month               salary     this month      to-date
-----               ------     ----------      -------

05/80   100% of    1870.00       1870.00       1870.00 
06/80   100% of    1870.00       1870.00       3740.00 
07/80   100% of    1870.00       1870.00       5610.00 
08/80   100% of    1870.00       1870.00       7480.00 
09/80   100% of    2057.00       2057.00       9537.00 
10/80   100% of    2057.00       2057.00      11594.00 
11/80   100% of    2057.00       2057.00      13651.00 
12/80   100% of    2057.00       2057.00      15708.00 
01/81   100% of    2057.00       2057.00      17765.00 
02/81   100% of    2057.00       2057.00      19822.00 
Summary of HAYES on NSF-78 from 05/80 thru 02/81

month               salary     this month      to-date
-----               ------     ----------      -------

05/80   30 % of    2125.00        637.50        637.50 
06/80   5  % of    2125.00        106.25        743.75 
07/80   5  % of    2125.00        106.25        850.00 
08/80   5  % of    2125.00        106.25        956.25 
09/80   5  % of    2337.50        116.87       1073.12 
10/80   5  % of    2337.50        116.87       1190.00 
11/80   5  % of    2337.50        116.87       1306.87 
12/80   5  % of    2337.50        116.87       1423.75 
01/81   5  % of    2337.50        116.87       1540.62 
02/81   5  % of    2337.50        116.87       1657.50 
Summary of POOR on NSF-78 from 05/80 thru 02/81

month               salary     this month      to-date
-----               ------     ----------      -------

05/80   25 % of    1802.00        450.50        450.50 
06/80   5  % of    1802.00         90.09        540.60 
07/80   5  % of    1802.00         90.09        630.70 
08/80   5  % of    1802.00         90.09        720.79 
09/80   5  % of    1982.19         99.10        819.90 
10/80   5  % of    1982.19         99.10        919.02 
11/80   5  % of    1982.19         99.10       1018.13 
12/80   5  % of    1982.19         99.10       1117.23 
01/81   5  % of    1982.19         99.10       1216.34 
02/81   5  % of    1982.19         99.10       1315.45 
Summary of FROST on NSF-78 from 05/80 thru 02/81

month               salary     this month      to-date
-----               ------     ----------      -------

05/80   30 % of    1948.00        584.40        584.40 
06/80   5  % of    1948.00         97.40        681.80 
07/80   5  % of    1948.00         97.40        779.20 
08/80   5  % of    1948.00         97.40        876.60 
09/80   5  % of    2142.80        107.13        983.74 
10/80   5  % of    2142.80        107.13       1090.88 
11/80   5  % of    2142.80        107.13       1198.02 
12/80   5  % of    2142.80        107.13       1305.16 
01/81   5  % of    2142.80        107.13       1412.30 
02/81   5  % of    2142.80        107.13       1519.44 
Summary of GINI-G on NSF-78 from 05/80 thru 02/81

month               salary     this month      to-date
-----               ------     ----------      -------

05/80   100% of     500.00        500.00        500.00 
06/80   100% of     500.00        500.00       1000.00 
07/80   100% of     500.00        500.00       1500.00 
08/80   100% of     500.00        500.00       2000.00 
09/80   50 % of     500.00        250.00       2250.00 
10/80
11/80
12/80
01/81
02/81
Summary of GINI-M on NSF-78 from 05/80 thru 02/81

month               salary     this month      to-date
-----               ------     ----------      -------

05/80   100% of     500.00        500.00        500.00 
06/80   100% of     500.00        500.00       1000.00 
07/80   100% of     500.00        500.00       1500.00 
08/80   100% of     500.00        500.00       2000.00 
09/80   50 % of     500.00        250.00       2250.00 
10/80
11/80
12/80
01/81
02/81
Summary of COX on NSF-78 from 05/80 thru 02/81

month               salary     this month      to-date
-----               ------     ----------      -------

05/80   50 % of     994.00        497.00        497.00 
06/80   50 % of     994.00        497.00        994.00 
07/80   100% of     994.00        994.00       1988.00 
08/80   100% of     994.00        994.00       2982.00 
09/80   100% of     994.00        994.00       3976.00 
10/80   50 % of    1114.00        557.00       4533.00 
11/80   50 % of    1114.00        557.00       5090.00 
12/80   50 % of    1114.00        557.00       5647.00 
01/81   50 % of    1114.00        557.00       6204.00 
02/81   50 % of    1114.00        557.00       6761.00 
Summary of GOLDMAN on NSF-78 from 05/80 thru 02/81

month               salary     this month      to-date
-----               ------     ----------      -------

05/80   50 % of    1074.00        537.00        537.00 
06/80   50 % of    1074.00        537.00       1074.00 
07/80   100% of    1074.00       1074.00       2148.00 
08/80   100% of    1074.00       1074.00       3222.00 
09/80   100% of    1074.00       1074.00       4296.00 
10/80   50 % of    1202.00        601.00       4897.00 
11/80   50 % of    1202.00        601.00       5498.00 
12/80   50 % of    1202.00        601.00       6099.00 
01/81   50 % of    1202.00        601.00       6700.00 
02/81   50 % of    1202.00        601.00       7301.00 
Summary of LOWE on NSF-78 from 05/80 thru 02/81

month               salary     this month      to-date
-----               ------     ----------      -------

05/80   35 % of    1074.00        375.90        375.90 
06/80   35 % of    1074.00        375.90        751.80 
07/80
08/80
09/80
10/80   35 % of    1202.00        420.70       1172.50 
11/80   35 % of    1202.00        420.70       1593.20 
12/80   35 % of    1202.00        420.70       2013.90 
01/81   35 % of    1202.00        420.70       2434.60 
02/81   35 % of    1202.00        420.70       2855.30 
Summary of MAPLES on NSF-78 from 05/80 thru 02/81

month               salary     this month      to-date
-----               ------     ----------      -------

05/80   25 % of     994.00        248.50        248.50 
06/80   25 % of     994.00        248.50        497.00 
07/80
08/80
09/80
10/80   25 % of    1114.00        278.50        775.50 
11/80   25 % of    1114.00        278.50       1054.00 
12/80   25 % of    1114.00        278.50       1332.50 
01/81   25 % of    1114.00        278.50       1611.00 
02/81   25 % of    1114.00        278.50       1889.50 
Summary of MUJTABA on NSF-78 from 05/80 thru 02/81

month               salary     this month      to-date
-----               ------     ----------      -------

05/80   50 % of    1074.00        537.00        537.00 
06/80   50 % of    1074.00        537.00       1074.00 
07/80   100% of    1074.00       1074.00       2148.00 
08/80   100% of    1074.00       1074.00       3222.00 
09/80   100% of    1074.00       1074.00       4296.00 
10/80   50 % of    1202.00        601.00       4897.00 
11/80   50 % of    1202.00        601.00       5498.00 
12/80   50 % of    1202.00        601.00       6099.00 
01/81   50 % of    1202.00        601.00       6700.00 
02/81   50 % of    1202.00        601.00       7301.00 
Summary of SALISBURY on NSF-78 from 05/80 thru 02/81

month               salary     this month      to-date
-----               ------     ----------      -------

05/80   50 % of    1074.00        537.00        537.00 
06/80   50 % of    1074.00        537.00       1074.00 
07/80   100% of    1074.00       1074.00       2148.00 
08/80   100% of    1074.00       1074.00       3222.00 
09/80   100% of    1074.00       1074.00       4296.00 
10/80   50 % of    1202.00        601.00       4897.00 
11/80   50 % of    1202.00        601.00       5498.00 
12/80   50 % of    1202.00        601.00       6099.00 
01/81   50 % of    1202.00        601.00       6700.00 
02/81   50 % of    1202.00        601.00       7301.00 
Summary of BAKER on NSF-78 from 05/80 thru 02/81

month               salary     this month      to-date
-----               ------     ----------      -------

05/80   50 % of    1285.34        642.67        642.67 
06/80   50 % of    1285.34        642.67       1285.34 
07/80
08/80
09/80
10/80   50 % of    1439.58        719.79       2005.13 
11/80   50 % of    1439.58        719.79       2724.92 
12/80   50 % of    1439.58        719.79       3444.71 
01/81   50 % of    1439.58        719.79       4164.50 
02/81   50 % of    1439.58        719.79       4884.29 
Summary of BLICHER on NSF-78 from 05/80 thru 02/81

month               salary     this month      to-date
-----               ------     ----------      -------

05/80   50 % of     936.00        468.00        468.00 
06/80   50 % of     936.00        468.00        936.00 
07/80
08/80
09/80
10/80   50 % of    1439.58        719.79       1655.79 
11/80   50 % of    1439.58        719.79       2375.58 
12/80   50 % of    1439.58        719.79       3095.37 
01/81   50 % of    1439.58        719.79       3815.16 
02/81   50 % of    1439.58        719.79       4534.95 
Summary of RUBLEE on NSF-78 from 05/80 thru 02/81

month               salary     this month      to-date
-----               ------     ----------      -------

05/80   50 % of     953.32        476.66        476.66 
06/80   50 % of     953.32        476.66        953.32 
07/80   0  % of     953.32          0.00        953.32 
08/80   0  % of     953.32          0.00        953.32 
09/80   0  % of    1048.65          0.00        953.32 
10/80   50 % of    1048.65        524.32       1477.64 
11/80   50 % of    1048.65        524.32       2001.97 
12/80   50 % of    1048.65        524.32       2526.29 
01/81   50 % of    1048.65        524.32       3050.62 
02/81   50 % of    1048.65        524.32       3574.94 
Summary of SECRETARY on NSF-78 from 05/80 thru 02/81

month               salary     this month      to-date
-----               ------     ----------      -------

05/80   60 % of    1090.00        654.00        654.00 
06/80   60 % of    1090.00        654.00       1308.00 
07/80   60 % of    1090.00        654.00       1962.00 
08/80   60 % of    1090.00        654.00       2616.00 
09/80   60 % of    1199.00        719.40       3335.40 
10/80   60 % of    1199.00        719.40       4054.80 
11/80   60 % of    1223.00        733.80       4788.60 
12/80   60 % of    1223.00        733.80       5522.39 
01/81   60 % of    1223.00        733.80       6256.19 
02/81   60 % of    1223.00        733.80       6989.99 
Summary of ALLEN on NSF-78 from 05/80 thru 02/81

month               salary     this month      to-date
-----               ------     ----------      -------

05/80   15 % of    1692.00        253.80        253.80 
06/80   10 % of    1692.00        169.19        423.00 
07/80   10 % of    1692.00        169.19        592.20 
08/80   10 % of    1692.00        169.19        761.39 
09/80
10/80
11/80
12/80
01/81
02/81
Summary of REFUND on NSF-78 from 05/80 thru 02/81

month               salary     this month      to-date
-----               ------     ----------      -------

05/80
06/80   100% of    8818.00-      8818.00-      8818.00-
07/80
08/80
09/80
10/80
11/80
12/80